Development projects are rife with all sorts of challenges. Contending with ever-evolving technology is just one of the daily challenges that developers must face when working on projects. Embarcadero recently conducted a developer survey that identified which among these hurdles is the toughest to clear, and they just released the results for the top three project challenges:
- Not enough time to accomplish the assigned tasks (52% of those surveyed)
- Poor unit and system testing (31%)
- Insufficient or no requirements (30%)
Are any of these a surprise? Do you agree with their order in the rankings? Which challenges would you have ranked above them?